ServicesIndustriesProjectsService areasCompanyInsightsContactestimating@westpacificcoatings.com

Commercial flooring

Floors that survive the public, installed while you sleep.

Retail, hospitality, offices, schools and healthcare — durable, cleanable floor systems scheduled around your operating hours, not through them.

Overview

The constraint on a commercial floor is rarely the floor.

On an industrial job we plan around forklifts and chemical exposure. On a commercial job we plan around trading hours, a lobby that has to stay presentable while work happens fifteen metres away, and a client whose real cost of a mistake is a week of lost business rather than a week of lost production.

So the technical selection matters, but the scheduling is what we get judged on. We work nights, weekends and holidays, section spaces so half a floor stays open, and build the programme backwards from the hour you need the doors open.

Typical schedule
Nights & weekends
Light foot traffic
4–6 hours
Full service
~24 hours
Finishes
Matte to high-polish
Pumpkin-orange urethane floor in a Whistler commercial interior, running along the glazed partitions and stopping clean at the grey concrete
High-gloss pumpkin-orange urethane floor across an open room in Whistler, the walls masked with blue tape

A commercial interior in Whistler, 2014, in a pumpkin-orange urethane: along the glazed partitions to a clean edge at the grey concrete (left), and across an open room (right). More on our Whistler page.

By sector

Different rooms, genuinely different specifications.

What each commercial setting actually needs from a floor
SettingThe real requirementWhat we usually specify
Retail & showroomAppearance under bright lighting, resistance to cart wheels and grit tracked in from outsidePolished concrete at a honed or semi-polished level, or a smooth coating where a specific colour is needed
Restaurants & commercial kitchensSlip resistance when wet with grease, tolerance of hot wash-down, coved junctions for health inspectionUrethane mortar with an integral cove in the kitchen; a decorative broadcast system front-of-house
Offices & lobbiesAppearance, low ongoing maintenance, quiet installation in occupied buildingsPolished concrete, or a smooth roller-applied or self-levelling system
Schools & institutionsDurability against heavy foot traffic, easy cleaning, low odour during install, tight holiday windowsLow-odour epoxy or urethane build-ups scheduled into spring break or summer
Healthcare & labsSeamless cleanable surface, chemical resistance, coved detailing, controlled disruptionSelf-levelling epoxy or urethane with coved junctions, installed in phased sections
Back-of-house & storageCost-effective durability, dust control on a bare slabRoller-applied coating or a densified, ground finish

Return-to-service and finish selection depend on the substrate, the system and site conditions. We confirm both on site before quoting.

High-gloss clear epoxy and urethane coating over the concrete of a Downtown Vancouver restaurant during the fit-out, the slab aggregate showing through
Close-up of the clear coat over the concrete at a Downtown Vancouver restaurant, the stone in the slab visible under the gloss

A restaurant front-of-house in Downtown Vancouver, 2014, finished in a clear epoxy and urethane coating during the fit-out: the high-gloss floor running back to the open stud walls (left), and the stone in the slab showing through the clear coat (right). More on the projects page.

Showroom floor in urethane coatings, laid out in large orange and charcoal diagonal sections under the track lighting
High-gloss orange and charcoal urethane floor meeting at a point in the middle of a showroom

A showroom finished in urethane coatings in two colours: large orange and charcoal diagonal sections across the room (left), meeting at a point in high gloss (right). More on the projects page.

A commercial fit-out floor finished in self-levelling topping, stained in mottled brown and grey and polished, the counters going in
The stained and polished floor running along the windows of a commercial fit-out, the glazing still papered over

A commercial fit-out finished in a self-levelling topping, stained and polished: the main room with the counters going in (left), and along the papered-over windows (right). More on the projects page.

Concrete polished to a cream finish, up to 3,000 grit, running to the stair of a framed-out interior
The polishing machine on a cream-polished concrete floor, the studs reflected in the 3,000-grit finish

Concrete polished to a cream finish, taken up to 3,000 grit: the finished floor running to the stair before the walls were closed in (left), and the polishing machine on it, the studs reflected in the floor (right). More on the projects page.

A ResinTech EWS flake floor along a tiled corridor, laid up to the trench drain, with a coved flake base on both walls
ResinTech EWS flake floor in grey, black and white by the furnace and electrical room doors, carried up the tiled walls as a coved base

A ResinTech EWS flake system through a tiled corridor: the grey, black and white flake laid up to the trench drain, with the coved base on both walls (left), and by the furnace and electrical room doors, carried round the corner (right). More on the projects page.

Process

How a commercial install runs.

  1. Site visit and moisture test

    We look at the slab, check what is on it now, and test it for moisture. A slab driving vapour will lift a new floor off within a year, and it is far cheaper to find that out with a probe than with a failure.

  2. Mock-up where appearance matters

    On polished and decorative work we produce a sample panel on your actual slab. Aggregate exposure and sheen cannot be judged from a photograph, and the first grinding pass is irreversible.

  3. Programme built around your hours

    We agree the sections, the shift pattern and the exact hour each area returns to service, then work to it. Dust containment and negative air where the space next door stays open.

  4. Preparation

    Diamond grinding or shot blasting to the profile the system requires, crack routing and filling, patching, and detailing at drains, thresholds and wall junctions.

  5. Installation

    The specified build-up, at documented coverage rates, within the manufacturer's ambient and recoat windows.

  6. Handover

    Walk the floor with you, hand over the maintenance regime for the system in plain terms, and tell you what will shorten its life — usually the wrong cleaning chemical, applied nightly for five years.

On occupied buildings we would rather do fewer square feet per night than hand you a space that is not ready to open. If the schedule you need is not achievable at the quality we would stand behind, we will say that during the quote rather than discover it at 5am.
Showroom floor masked into diagonal sections with blue tape, charcoal coat down and the orange going on
Crew rolling the orange urethane coat inside a taped-off diagonal section of a showroom floor

The same showroom going down: the room masked into diagonal sections with the charcoal coat already on (left), and the crew rolling the orange one section at a time (right).

A commercial slab in Vancouver after shot blasting, its joints and cracks filled before the epoxy
The same commercial space in Grandview, Vancouver, finished in a high-gloss grey epoxy through to the doorways

A commercial space in Grandview, Vancouver, 2017: the slab after shot blasting, its joints and cracks filled (left), and the grey epoxy finished high-gloss through to the doorways (right). More on the projects page.

Recent work

Aritzia head office

White urethane over more than 40,000 square feet, carried from the glazed office corridors, through open-plan desking and into the staff cafeteria. Rooms with different uses, read as one space.

Seamless white resin floor through a glazed office corridor at the Aritzia head office
Aritzia head office — glazed office corridor
White urethane office floor with carpet inset under a run of desks, Aritzia head office
Aritzia head office — open-plan floor with carpet inset
Seamless white floor in the staff cafeteria at the Aritzia head office
Aritzia head office — staff cafeteria
White urethane floor along a corridor past glass-fronted offices at the Aritzia head office
White urethane floor along the glass-block wall of the Aritzia head office corridor

Aritzia head office: the white urethane floor past the glass-fronted offices (left), and along the glass-block wall (right).

Recent work

UBC Biological Sciences Building

A Tennant coating system through 20,000 square feet of laboratories and corridors in the UBC Biological Sciences Building in 2010, for Scott Construction: the joints and cracks patched and filled, a coved base formed at the walls, and Eco-HTS 100, a high-traffic system with a chemical-resistant, aliphatic satin urethane topcoat, as the finish.

Glossy grey Eco-HTS 100 floor across a laboratory in the UBC Biological Sciences Building
Glossy white Eco-HTS 100 floor along a corridor in the UBC Biological Sciences Building

The UBC Biological Sciences Building, 2010, for Scott Construction, 20,000 square feet: Tennant’s Eco-HTS 100 with an aliphatic satin urethane topcoat through the laboratories and corridors. More on the projects page.

A laboratory slab in the UBC Biological Sciences Building with its cracks and joints filled before coating
A grey coved base formed at the walls of a UBC Biological Sciences Building laboratory, the first coat going onto the slab

The same job before the finish: a laboratory with its cracks and joints filled (left), and the coved base formed at the walls with the first coat going onto the slab (right).

An open laboratory in the UBC Biological Sciences Building with its slab prepared before coating
The first coat going across the same open laboratory in the UBC Biological Sciences Building

One of the open laboratories: the slab prepared (left), and the first coat going across it (right).

More work

A rink, a school and a casino stair

Three more interiors, each with its own system: an anti-slip epoxy at Canlan Ice Sports in Burnaby, a decorative flake floor at Mulgrave School, and a random flake system on the stairs at Hard Rock Casino Coquitlam.

Anti-slip epoxy floor in the concourse at Canlan Ice Sports, Burnaby
A 100% solids epoxy anti-slip coating at Canlan Ice Sports in Burnaby, 2015. More on the projects page.
Grey decorative flake floor in a room at Mulgrave School
A Sika decorative flake floor at Mulgrave School. More on the projects page.
A black stair landing at Hard Rock Casino Coquitlam masked with tape for the warning strips, the gold flake stair nosings already laid below
A stair landing at Hard Rock Casino Coquitlam in black with bands of gold flake warning strips, the gold stair nosings beyond

A random flake system on the stairs at Hard Rock Casino Coquitlam, 2013: a landing masked with tape for the warning strips, the gold flake nosings already laid below (left), and a finished landing striped in gold flake above the treads (right). More on the projects page.

Dog daycare, Vancouver

Adventure Den dog daycare

In 2014 we laid an epoxy and urethane floor through Adventure Den, the Vancouver dog daycare, in an old warehouse while its rooms were still being framed. The cracks in the slab were filled first, then the floor went down in light grey with a chemical-resistant urethane, round every yellow column and up to the green-painted walls.

Crew rolling the coating by the stair at the Adventure Den dog daycare in Vancouver
Glossy light grey epoxy and urethane floor through the Adventure Den dog daycare in Vancouver, from the stair to the rooms still being framed

Adventure Den dog daycare, Vancouver, 2014: the crew rolling the coating by the stair (left), and the finished floor through to the rooms being framed (right). More on the projects page.

Client
Adventure Den
Setting
Dog daycare
System
Epoxy and urethane
Completed
2014
The coat going on round a yellow column at the Adventure Den dog daycare, Vancouver, the roller tray still on the floor
The bare warehouse slab at the Adventure Den dog daycare in Vancouver with its cracks filled before coating

Adventure Den, 2014: the coat going on round a yellow column, the roller tray still on the floor (left), and the slab with its cracks filled beforehand (right).

Questions

What commercial clients ask.

Can you work outside our business hours?

Yes, and on retail and hospitality work that is the normal arrangement. We schedule nights, weekends and statutory holidays so the space is back in service before you open. It costs more in labour than a straight daytime schedule, and it costs far less than closing for a week.

How long before we can walk on it and put furniture back?

It depends on the system and the temperature, but for a typical commercial build-up expect light foot traffic within roughly four to six hours and full service including heavy furniture and rolling loads at around twenty-four hours. Cold conditions extend both. We give you the real numbers for your system before we start, not optimistic ones.

What is the difference between a commercial floor and an industrial one?

Mostly what the floor has to survive and what it has to look like. An industrial floor is specified around forklifts, impact and chemical exposure, and appearance is secondary. A commercial floor is specified around appearance, cleanability, slip resistance and the ability to be installed without shutting the business, with lighter mechanical loads. Different priorities, often overlapping products.

Will a coating cover the cracks and stains in our existing slab?

Cracks, no — not on their own. A crack that is still moving will telegraph through a coating unless it is properly routed, filled and detailed first, which we do as part of the scope. Stains are usually covered by an opaque system, but if you are considering a polished finish rather than a coating, understand that polishing exposes the slab rather than hiding it, so existing staining and patching become part of the look.

Which is better for a lobby — polished concrete or a coating?

Polished concrete if you want the look of the slab, a surface with nothing on top to delaminate, and very low ongoing maintenance. A coating if you need a specific colour, need to cover a slab in poor condition, or need chemical or slip performance that polishing cannot give you. In lobbies and showrooms we lean toward polished when the slab is decent, because it ages better.

Related

Where to go next.

Coating systems compared

The honest comparison of traffic membranes, epoxies, urethane mortar and polished concrete.

Learn more →

Polished concrete

Mechanically polished and densified floors, from matte to mirror finish.

Learn more →

Industrial floor coatings

Epoxy and urethane systems for plants, warehouses and shops.

Learn more →

Next step

Tell us your opening hours first.

The schedule shapes the specification as much as the floor does. Send us the space, the use and the hours you cannot lose.

Main (604) 968-2040
Second (604) 230-0256
estimating@westpacificcoatings.com